Government Schemes and Policy · 17 March 2026

Prime Minister Narendra Modi Launches Development Projects Worth ₹47,800 Crore in Assam

Exam-focused facts from the 17 March 2026 current affairs briefing.

Key facts

  • Prime Minister Narendra Modi inaugurated and launched multiple development projects worth ₹47,800 crore in Assam.
  • Under the Assam Mala 3.0 Road Infrastructure Initiative, approximately 900 km of roads will be constructed at a cost of over ₹3,200 crore.
  • Six infrastructure projects, including four flyovers and two bridges, will be implemented in the Bodoland Territorial Region (BTR) at a cost of over ₹1,100 crore.
  • A Railway Periodic Overhaul (POH) workshop will be established at Basbari in Kokrajhar district to strengthen maintenance capacity.
  • Three new train services were introduced: Kamakhya–Charlapalli Amrit Bharat Express, Guwahati–New Jalpaiguri Express, and Narengi–Agartala Express.
  • The 22nd installment of the Pradhan Mantri Kisan Samman Nidhi (PM-KISAN) was released, with 18.59 lakh farmers in Assam receiving ₹371 crore.
  • The Kopili Hydroelectric Project, valued at over ₹2,300 crore, will be implemented in Dima Hasao and West Karbi Anglong districts.
  • The capacity of the Numaligarh Refinery (NRL) will be expanded from 3 MMTPA to 9 MMTPA through the Numaligarh–Siliguri Product Pipeline Expansion.
  • The North-East Gas Grid – Phase I will connect Guwahati, Numaligarh, Gohpur, and Itanagar, with a branch extending to Dimapur.
  • A rail-connected Petroleum, Oil, and Lubricants (POL) terminal will be established at Panchgram in Hailakandi district.
  • Railway electrification projects covering Rangia–Murkongselek, Chaparmukh–Dibrugarh, Badarpur–Silchar, and Badarpur–Churaibari sections were completed at a cost of over ₹2,250 crore.
  • The Furkating–Tinsukia railway line will be doubled over a distance of 194 km at a cost of over ₹3,600 crore.
  • Inland waterway projects include cruise terminals at Biswanath Ghat and Nemati, and a Regional Centre of Excellence for Maritime Training at Bogibeel.
  • A ropeway project will be constructed between Kamakhya Railway Station and Kamakhya Temple to transport approximately 17,000 passengers daily.
  • A PM Ekta Mall will be established in Guwahati to showcase handicrafts, handloom products, and One District One Product (ODOP) items.
  • The Shillong–Silchar High-Speed Corridor, spanning 166 km, will be constructed at an estimated cost of ₹22,860 crore.
  • A new Agriculture College will be established at Patharkandi in Karimganj district.